+86 139 5134 9332         customer601@sunhongco.com
Fax: +86 516 85697696
You are here: Home » News » Product News » How to install and use forming fabric?

How to install and use forming fabric?

Views: 43     Author: Site Editor     Publish Time: 2022-08-17      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button


How to install forming fabric


forming fabric

1. Before installing the dry fabric, please check whether the equipment is in good condition. Unevenness, inclination, sharp burr, sand and other phenomena are strictly prohibited at the contact parts with the fabric work. The guiding fabric work system must be flexible.

2. The operation direction shall be consistent with the arrow direction on the fabric, the fabric shall be placed in the correct position, and the rollers shall be parallel to each other to prevent the fabric from deviation and discount.

3. A swing type high-pressure water device is required to flush the pipe fabric work.

4. When installing the dry fabric, the fabric shall be slightly tightened and lubricated with water. After sizing, pay attention to adjust the tension of the fabric to the normal level.









How to use forming fabric

use forming fabric1. Natural elongation occurs at the initial stage of operation. In the first 1-2 days of operation, adjust the tension of the fabric at any time to make it meet the standard and keep the tension stable. After 3 days of operation, the elongation of the fabric tended to be stable.  

2. During use, the high-pressure water shall be sprayed, cleaned and closed in time to avoid damage to the pipe fabricwork.  

3. For large-area washing, 5% alkaline solution or 10% acidic solution can be used, or soft wool or nylon brush can be used for cleaning, and then water can be used for cleaning.  

4. When the machine stops for a long time, the fabric must be loosened and the suction system must be stopped. If maintenance is required in the process of use, the fabricwork shall be carefully removed. When the fabricwork is connected again, the fabricwork shall be connected according to the original operation direction. It is strictly prohibited to reverse.





Established in 2010, Sun Hong Group is a comprehensive company integrating planning, design, technical support, production, testing and training. We have a professional technical... 
Copyright© Sun Hong Group   

Quick Links

Contact Us

  +86 139 5134 9332
Fax: +86 516 85697696
Office:  A2 building YunChuang science and technology park Pinshannan road Gulou district Xuzhou city Jiangsu province China
Factory:  The 5th Building No 241 Huai Hai West Road China
Leave a Message
Contact us